No | Nama Peserta | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. TORSI ENGINEERING KONSULTAN - 96.444.025.9-922.000 | Rp. 39.955.560,00 | Rp. 39.955.560,00 | Rp. 39.955.560,00 | |||||||
2 | CV. CENTRAL DISAIN - 90.484.054.3-922.000 | ||||||||||
3 | CV. MOMEN ENGINEERING KONSULTAN - 91.512.348.3-922.000 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak